 |
|
NEW LEAD BALLAST
This year
we clean the
ballast compartements in the bottom box keel of the ship,
take all rusty steel punchings out and pour over 10 tons of liquid lead in
the keel. We use big gas torches and a heavy melting pot to melt the lead
bars.
Keep the pot hot!!
This new solid lead
ballast, with a much lower center of gravity than the original steel punchings,
brough the center of gravity of the entire vessel down without increase of
the displacement of the total ship. And this resulted in more upright sailing,
more speed and better upwind performance.
Thanks to the advise of mr Dick Boon and his famous ship design group "Vripack/Netherlands". |
Jobs
of the year 1999/2000
new
lead in keel and new bottom paint
the second half of all the standing rigging renewed
new fridge,
new RIB-tender, new Yamaha outboard
new canvasses, leecloth, seatsquabs
new 24 V and 12 V start batteries
new Cetrek Autopilot
galvanise anchors and chains
overhaul Maxwell electric windlass
main engine new pistonrings and alternator and exhaust gas thermometer
overhaul: sheetwinches, watermaker, all pumps and motors, airco.
new: washer, garmin 128 gps, flojet drinkwaterpump, lewco bilgealarms, generator
injectors, fenders, speakers,
new heart interface inverter. |
|
|
|
|
|